Return to release.frag CVS log | Up to [LON-CAPA] / doc / build |
- adding FC5 to the testing release section - updating the release scedule - updating the release scedule - updating the release scedule - updating the release scedule
1: <hr /> 2: <a name="schedule" /> 3: <h3>2.2 Release Schedule</h3> 4: <ul> 5: <li>July 5th - a 2.1.99.0 was be installed on MSU</li> 6: <li>July 16th - a 2.1.99.1 will installed on MSU</li> 7: <li>August 11th - 2.2.0 release</li> 8: </ul> 9: