--- loncom/html/adm/help/tex/BridgeTask_Conditions.tex 2007/05/30 15:35:14 1.1 +++ loncom/html/adm/help/tex/BridgeTask_Conditions.tex 2013/08/20 15:35:30 1.2 @@ -2,7 +2,7 @@ It is possible to configure bridge tasks such that only when a student passes a Bridge Task does the next Bridge Task appear to the student. This feature is useful in such cases as Bridge Tasks are related to one another, and the results of one Bridge Task is needed for the next Bridge Task. -To create configure bridge tasks these way, a sequence page must be created. A resource author starts at his/her construction space (Main menu: CSTR). Once in the construction space, the author create a new assembled sequence. See \ref{Creating_A_Course_Intro} for a more concise reference on condition and sequences. +To create configure bridge tasks these way, a sequence page must be created. A resource author starts at his/her authoring space (Main menu: AUTH). Once in the authoring space, the author create a new assembled sequence. See the section \ref{Creating_A_Course_Intro} for a more concise reference on condition and sequences. The author must create various conditionals to determine which resources to show. The easiest way to do this is by using advanced edit. The advanced edit visualizes the various conditions and resources. This interface needs popups, so make sure popups are enabled in the browser.